(1)
Morillo, D.; Moreno, L.; Díaz, J. Analytic and Heuristic Methodologies for Solving the Resource Constrained Project Scheduling Problem (RCPSP): A Review. Part 2. ing.cienc. 2014, 10 (20), 203-227. https://doi.org/10.17230/ingciencia.10.20.12.