[1]
D. Morillo, L. Moreno, and J. Díaz, “Analytic and Heuristic Methodologies for Solving the Resource Constrained Project Scheduling Problem (RCPSP): a Review. Part 2”, ing.cienc., vol. 10, no. 20, pp. 203–227, June 2014, doi: 10.17230/ingciencia.10.20.12.